UNITED UTILITIES

tech2Technica carried out the detail design services for several water and waste water treatment site upgrades.

The designs were based on client provided P&ID’s. electrical drive and instrument schedules. The scopes covered the interface of instrumentation, actuated valves, pumps, telephone system, intruder system, fire/gas systems and telemetry to the associated MCCs and ICA panels.

The electrical design and engineering also involved extensive HV electrical redesign.

Services Technica provided on these projects:

> Electrical Design

  • Liaison with REC regarding switchboard replacement.
  • Cable calculations, discrimination studies, lighting and earthing.
  • Telephone system design.
  • Intruder and fire alarm system designs.

> Instrument Design – data sheets and loop diagrams

> Instrumentation and Electrical Field Equipment Installation

> Electrical Distribution, Lighting and Small Power

> Cabling BS5467 and BS5308

> Cable Management, Heacy Duty Ladder and Tray

> Electrical Testing and Certification

> Instrument Loop/Point to Point Checks

> Project Handover Documentation

Project Details

CLIENT: United Utilities
LOCATION: UU WTW Sites, Manchester, UK
VALUE: £600k - £750k
DURATION: 12 months
PROJECTS: Water Treatment Works Site Upgrade